November 4, 2022

Pit Base

The rest of the limestone was installed today. Grout was added too. Also, the gas line for the fire pit was installed (big job). Jimmy and Chris laid out the base for the fire pit. It should arrive next week. The gas line will have to be cut down and the gravel foundation for those white tiles will be next week. Have a good weekend.